Heliostar Drills 31.8 g/t Gold over 9.5 Metres within 8.0 g/t Gold over 72.0 Metres in Up-Plunge Target at the Ana Paula Project
- Written by Newsfile
Highlights:
Hole AP-23-300
- 72.0 metres @ 8.0 grams per tonne (g/t) gold including
- 9.5 metres @ 31.8 g/t gold
Hole AP-23-302
- 52 metres @ 5.0 g/t gold
Hole AP-23-299
- 11 metres @ 15.8 g/t gold
The up-plunge target is expected to connect into a single block of continuous high grade gold mineralization.
Hole AP-23-300 is 480% better...

